# Built Robotics

Autonomous heavy equipment retrofits

Research: https://www.safecli.org/company/builtrobotics.com
Company: https://builtrobotics.com

## Evidence status

Procurement review needed
Source review: 2026-10-16T03:23:40.780Z
API: Unknown

Company-published claims, not independently verified controls. Unknown is not evidence of absence.

## Procurement checks

### Safety & supervision — Company-published

> Take people out of harm’s way with an 8-Layer Safety System that exceeds industry safety standards.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

> Take people out of harm’s way with an 8-Layer Safety System that exceeds industry safety standards.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Request the application-specific risk assessment and safety documentation; test emergency stops, exclusion zones and human supervision on site.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

### Field deployments — Company-published

> 0 Jobsite Injuries

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

> Using best-in-class sensors, software, and safety, Built engineers have developed a robust trenching solution that is designed to take a beating on any jobsite — and keep running like clockwork.

Source: https://www.builtrobotics.com/solutions/trenching
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Speak with a named contractor using this model on a comparable site; confirm scope, duration and operating conditions.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

### Measured productivity — Company-published

> Drive with precision.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

> Drive with precision.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Run a supervised site pilot against your crew baseline; count setup, rework, downtime and intervention, not just peak speed.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

### Operating limits — Company-published

> The RPD 35 can carry up to 224 piles and a maximum payload of 34,000 pounds.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

> The RPD 35 can carry up to 224 piles and a maximum payload of 34,000 pounds.

Source: https://builtrobotics.com/
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Validate terrain, weather, payload, power and runtime limits against the actual site.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

### Maintenance & support — Company-published

> Complimentary Training & Installation ✓ ×

Source: https://www.builtrobotics.com/solutions/trenching
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Confirm local service coverage, replacement parts, operator training, response times and warranty exclusions.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

### Workflow integration — Company-published

> Maximize ROI with a suite of advanced features designed for utility-scale solar construction, including cloud-based dashboards, API integrations, and on-site technical support.

Source: https://assets.builtrobotics.com/production/public/download/Technical-Specifications-Online.pdf
Reviewed: 2026-10-16T03:23:40.780Z

- [ ] Test your actual plans, coordinate systems, data export and handoff to existing site workflows.
- [ ] Record reviewer, test date, scope, result and supporting artifact.

## Decision

- Owner:
- Intended use and data sensitivity:
- Blocking requirements:
- Pilot success criteria:
- Unresolved risks:
- Decision and review date:
